Faculty of air transport engineering the department of «air navigation systems»



Download 0,66 Mb.
bet20/27
Sana22.07.2022
Hajmi0,66 Mb.
#836941
1   ...   16   17   18   19   20   21   22   23   ...   27
Bog'liq
Qualifyinfg work

Start and Landing Controller
The launch and landing manager provides control of the use of the runway. Dispatchers are responsible for making the following decisions related to takeoff and landing operations.
Landing permit
Safe landing is only possible under a number of conditions. The most important conditions in this case are:
• the absence of aircraft on the runway at the time of the passage of the near beacon by the aircraft landing
• the absence of aircraft and vehicles on the pre-landing line and in the critical zone of the radio beacon landing system at the time of passage by the plane approaching the landing point at the glide path under meteorological conditions of I and II category ICAO or before the start of the fourth turn under meteorological conditions of III category ICAO.
Thus, the landing control process from the start and landing manager is modeled as follows.
Table 1.3. The distance of the aircraft making the landing from the runway threshold necessary to permit landing (depending on weather conditions)




Weather conditions

Simple

I and II categories of ICAO

ICAO Category III

Decision line on landing permission

Near beacon

Glide path entry point

4th turn start point

Distance (km)

1

8

18

Time (s) based on a speed of 300 km / h

12

100

220

In accordance with table 1.3, when simulating an aircraft landing, the moment of time is selected when a final decision must be made on whether to allow or cancel this operation. At this point in time, an event is planned whose processing is associated with sending a request to an object representing the launch and landing manager. When processing the request, the busy flag is checked for all locations related to the runway where this operation is performed. If for some reason by this moment the aircraft is in the landing zone, which impedes its implementation, the situation of canceling the landing operation is simulated.
The requirement is also taken into account that when flying from one runway and parallel runways, the distance between the axes of which is less than 1000 meters, the time interval between successive takeoff and landing should be at least 1 minute.
It should be noted that the cancellation of the landing is a rather dangerous operation and is considered as an emergency. Therefore, one of the main tasks of the dispatcher is to ensure the conditions for the successful completion of all landing operations, that is, the absence of pa on the runway of other aircraft.
At the time of the decision to allow landing, the runway may be occupied by the aircraft, either landing or taking off. In the first case, the dispatcher can not influence the situation in any way, since the runway busy time during landing depends on the characteristics of the aircraft, weather conditions, and so on. Therefore, the absence of aircraft completing the landing operation by the time the next aircraft begins to land can only be achieved by maintaining the corresponding time interval between them. The size of this interval affects both flight safety and airport capacity. The study of the dependence of the characteristics of the airport on this parameter and the selection of the most suitable value is one of the tasks that can be performed using a simulation model. Therefore, the time interval between arriving aircraft is considered as a parameter of the model and is set by the user. The observance of this interval is the responsibility of a special simulation process that simulates the work of the air zone dispatcher, who is responsible for realizing this task.
Thus, the main task of the launch and landing manager is to ensure that there are no take-off aircraft at the time of landing on the runway. To do this, the dispatcher must control the access of departing aircraft to the runway. This is accomplished by controlling the movement of the aircraft from a preliminary start to an executive, as described below.
Note that the decision to allow or prohibit the landing is made immediately upon receipt of the corresponding request, that is, synchronously with the work of existing simulation processes.



Download 0,66 Mb.

Do'stlaringiz bilan baham:
1   ...   16   17   18   19   20   21   22   23   ...   27




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish