Electrical safety and electrical work procedure



Download 209,51 Kb.
Pdf ko'rish
bet26/33
Sana02.07.2022
Hajmi209,51 Kb.
#732365
1   ...   22   23   24   25   26   27   28   29   ...   33
Bog'liq
Electrical-Safety-and-Electrical-Work-Procedure-v3-1

electrical equipment
excluded by the scope of AS/NZS 3760 including: 

Equipment which would need to be dismantled to perform the inspection and tests specified in the 
Standard; 

Equipment such as suspended light fittings at a height of 2.5 metres or greater above the ground, 
floor or platform; 

Stationary equipment (> 18 kg and no carrying handles) connected by a flexible cord or cable which 
is not flexed during normal use or exposed to abuse or damage in a hostile environment; and 

Equipment connected by fixed wiring. 
5.3.5 Equipment which requires in-service testing and tagging 
(i) All equipment with a medium or high risk assessment (i.e. likely to be used in an electrically hostile 
environment. 
(ii) All repaired 
electrical equipment
, where repairs may have affected the electrical safety, to be inspected 
and tested before returning to service; and 
(iii) All second-hand (including loaned to UWA) 
electrical equipment
, to be inspected and tested before 
entering into service. 


Electrical Safety and Electrical Work Procedure 
Prepared: May 2015 
Version 3.1 
Authorised by University Safety Committee 
Review: 
May 2020 
Page 16 of 24 
This document is uncontrolled when printed. 
Business Units shall ensure that all non-installation electrical equipment used in electrically hostile 
environments is tagged (using durable labels). It is suggested the following information be on the tags which 
are available from UWA Safety, Health and Wellbeing: 

UWA logo; 

Business Unit; 

Equipment ID number (both visual and machine-readable); 

Generic equipment description (e.g. power board, desk lamp, drill, instrument) 

Last risk classification (by retest frequency); 

Last test date; 

1 Competent person (name and ID number); 

Next test date; and 

Provide for dated inspection marks (e.g., similar to fire extinguisher tags) 
5.3.6 Record keeping 
Business Units will record inspection and testing results. The following information will be recorded and be 
accessible to all staff, especially 

Download 209,51 Kb.

Do'stlaringiz bilan baham:
1   ...   22   23   24   25   26   27   28   29   ...   33




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish