Development finance assessment


Lack of quality data limits monitoring development progress



Download 0,88 Mb.
Pdf ko'rish
bet59/82
Sana20.04.2023
Hajmi0,88 Mb.
#930677
1   ...   55   56   57   58   59   60   61   62   ...   82
Bog'liq
UZB- DFA eng final

Lack of quality data limits monitoring development progress
National monitoring, evaluation, and decision-making systems in Uzbekistan present 
several weaknesses, many of which are linked to Uzbekistan’s data ecosystem (UNDP, 2018). 
Access to official data is often limited, particularly for data that are considered sensitive, 
and, when available, official data often present issues of reliability and quality
107
and is not 
disaggregated by vulnerability criteria. The generation of independent data by international 
organizations have tended to be restricted or permitted only through national research 
institutions, whose capacities for performing this work are not always adequate. The practical 
implications of this lack of data, for example, results in limited analysis of the economic and 
functional classification of government spending. Inter-sectoral data coordination is weak. 
The data collection systems of the SSC and line ministries often function in parallel with 
each other and are fragmented. Evaluation is not a common practice and mostly driven by 
107
Scholars and practitioners alike have questioned Uzbekistan’s official data published before 2017.


68
DEVELOPMENT FINANCE ASSESSMENT FOR THE REPUBLIC OF UZBEKISTAN
international organizations
108
. A critical weakness of the Uzbek SDG monitoring system is the 
lack of up-to-date, accurate population estimates
109
. The planned population census in 2022 
should be given a high priority and full support from the highest political levels.
As a result, the use of evidence for decision making remains discretionary, often focusing 
merely on demonstrating that a quota or targets have been met rather than on identifying 
and strengthening existing policies. In addition, data-related incentives for officials under 
the current system, including audits and disciplinary action, favor the demonstration of good 
outcomes rather than accuracy.
108
a list of 35 indicators, to be used for ranking all municipalities for performance evaluation purposes
109
The latest population census dates back to 1989 (UNECE, 2018).


69

Download 0,88 Mb.

Do'stlaringiz bilan baham:
1   ...   55   56   57   58   59   60   61   62   ...   82




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish