28
Chapter Three
Figure 3.1
Design criteria form, sheet 1.
south-facing space may have a greater peak cooling load in November
or December than in June or July, even though the outdoor ambient
condition is cooler. Load factors described below must be determined
for all these times. In addition to assumed maximum loads, all zones
must be calculated for one building peak time, usually 3 p.m. for an
office building. Public assembly buildings such as churches and arenas
Design Procedures: Part 1
Downloaded from Digital Engineering Library @ McGraw-Hill (www.digitalengineeringlibrary.com)
Copyright © 2004 The McGraw-Hill Companies. All rights reserved.
Any use is subject to the Terms of Use as given at the website.
Do'stlaringiz bilan baham: |