Car project for Drinking Water Supply and Sanitation in Three Divisional Headquarters and Surrounding Rural Areas Appraisal Report


  Consideration of Bank Group Experience and Lessons in Designing the



Download 403,54 Kb.
Pdf ko'rish
bet15/25
Sana23.12.2022
Hajmi403,54 Kb.
#894541
1   ...   11   12   13   14   15   16   17   18   ...   25
Bog'liq
Central African Republic - Project for Drinking Water Supply and Sanitation in three Divisional Headquarters and Surrounding Rural Areas

2.7 
Consideration of Bank Group Experience and Lessons in Designing the 
Project 
2.7.1
In 2007, the Bank carried out a review of the water and sanitation sector in CAR. 
In February 2009, the Bank also conducted a portfolio review which assessed the status of 
ongoing projects in CAR in detail. The study which underpinned the preparation of this 
project was managed satisfactorily by a Unit set up within the General Directorate of Water 
Resources. Furthermore, in March 2008, the World Bank and the Bank jointly carried out a 
country performance review. The following lessons accrued from these experiences: (i) 
difficulties in financing the counterpart contribution hamper project implementation; (ii) the 
procurement system is inadequate; (iii) the number of local service providers is limited; and 
(iv) foreign firms show little interest in bidding due to the country’s post-conflict situation. 
2.7.2
The above lessons were taken into account in designing the project, especially in 
terms of (i) fixing and spreading the counterpart contribution in project financing (the said 
contribution will be quite low since the Government will only finance compensation to 
affected persons); (ii) procurement arrangements which provide for support from an 
international expert to assist and train senior staff of the MMEH Procurement Unit; (iii) a key 
capacity building component for structures involved in implementing the project; and (iv) 
very simple design of works, thanks to which local companies will implement them without 
any problem if they are awarded a works contract. 
2.8 
Key Performance Indicators
2.8.1
There is no national programme or system for monitoring and evaluating the 
drinking water supply and sanitation sector. However, the DGH has a department in charge of 
project monitoring and evaluation with two units which, from every indication, lacks the 
necessary human and material resources. The project will support the establishment of a 
project monitoring/evaluation system by putting a monitoring/evaluation expert at the 
disposal of the Project Unit. Since the baseline data is available, monitoring/evaluation will 
be based on updated data collected through structures involved in implementing the project 
(DGH, municipal councils, Ministry of Health, consulting engineers, etc.). 
2.8.2
The key monitoring and evaluation indicators for the project are: 
(i) 
Impact indicators:
the project will contribute to the achievement of the 
MDGs in CAR, especially with regard to access to drinking water, 
sanitation and health, as well as poverty reduction. Such contribution will 
be monitored using indicators such as the poverty index, incidence of 
water-borne diseases, etc. 


10
(ii)
Output indicators
: the outputs directly related to project implementation 
involve an increase in the drinking water and sanitation access rate in the 
three divisional headquarters concerned. The output indicators are: 

Increase in the drinking water access rate in the three divisional 
headquarters and their surrounding rural areas from 32% in 2008 to 
100% in 2015 and beyond; 

Average increase in the sanitation services access rate from 10% in 
2007 to 20% in 2015; 

A positive change of behaviour towards hygiene by 80% of the 
population (52% of whom are women) in the project area; 

At least 280 permanent jobs (60% for women) are created. 
(iii)
Outcome
 indicators:
the main outcome indicators arising from project 
activities in the project area are: 

Number of water production, storage and transportation facilities 
rehabilitated and constructed (boreholes, water intake, treatment 
stations, overhead tanks and water pipes); 

Number of standpipes built (60 standpipes); 

Number of hand-operated pump boreholes (48 boreholes and two 
standalone water points); 

Number of private connections with meters (2 300 connections) 
made; 

Number of public latrines built (73 latrine blocks); 

Number of controlled landfills developed (three landfills of a surface 
area of two hectares each); 

Number of persons sensitized and educated on hygiene, the 
environment and health (160 000 people); 

Number of senior staff of the DGH, SODECA, municipal councils 
and regional directorates of heath and social affairs trained. 

Download 403,54 Kb.

Do'stlaringiz bilan baham:
1   ...   11   12   13   14   15   16   17   18   ...   25




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish