2.3 Project 
Type 
This operation is designed as a Grant for an investment project. It is premature to 
adopt the sector-wide budgetary support approach (SWAp) at this juncture, considering the 
relatively weak institutional organization of the sector at the central and local levels, as well 
as the weak public expenditure internal control. As things stand, the project grant is the most 
suitable instrument, given that part of the resources will be used to support the main sector 
actors, namely DGH, SODECA, Berberati, Bouar and Bossangoa Councils, as well as the 
Department of Community Health and the Regional Directorates of Social Affairs. 
Furthermore, the support activities envisaged under the project will complement the 
institutional support that the African Water Facility plans to provide to the ongoing DWSS 
sector reform and strengthen the capacity of structures in charge of the sector at the central 
and decentralized levels.
 
 
2.4 
Project Cost and Financing Arrangements 
Overall project cost will amount to UA 10.354 million, net of taxes, of which UA 
8.514 million (82.23%) in foreign exchange and UA 1.840 million (17.77%) in local 
currency. The cost includes a 7% provision for physical contingencies and a 3% annual 
provision for price escalation. The ADF will contribute UA 7 million to project financing 
(67.61% of the total cost) in the form of a grant. The Rural Water Supply and Sanitation 
Initiative (RWSSI) Trust Fund will provide UA 3 million (28.97% of the cost), while the 
beneficiaries will contribute the equivalent of UA 0.257 million (2.48%) in kind (sand and 
gravel for the construction of latrines) and labour for the development of landfills. The 
Government will be responsible for paying compensation for loss suffered following the 
expropriation of property, assessed at UA 0.097 million (0.94% of the project cost).

Download 403,54 Kb.

Do'stlaringiz bilan baham:
1   ...   8   9   10   11   12   13   14   15   ...   25




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish