Writing task 1
Maps
Types
Comparison based
Manchester 2000
Manchester 2015
(garden)
Where should we build a school
Also:
Manchester 2010 (past simple)
Manchester now (present perfect)
Manchester now (present simple)
Manchester plan for development (prediction structure)
2. before/after maps
1) Voice
Natural changes
Intransitive verbs (o’timsiz fe’lla)
Manchester became more populated. (not was become)
Man-made change
Past simple
Present perfect
Future simple
3. Special map vocabulary:
1) to build = to construct = to erect
2) to convert into = to change into
3) to build instead = to build in place of = to replace with
4) to modernize
5) to expand = to widen
6) to extend
7) to spread (act)
8) to lay (railway)
9) to shorten in size
Also:
10) to change + adverb => changed considerably
11) to become + adjective => became modern
4. Location in the map
Every time you write about what happened to a particular area of the a map also mention the location of that particular area.
5.
Located
Situated
in
2 to situate = to locate
3 to lie
6.
7.
Next to = beside = by
Behind
In front of
Opposite = facing
Close to = near = in the vicinity of
Between
In the center = in the middle
8. common mistakes with maps
In the south-west was built a supermarket
The supermarket which is situated in the east was destroyed
The supermarket in the north-east was changed into a department store
Task 1 maps
Before/after
Introduction
Paraphrase the question
Overview paragraph
Should describe overall change in the appearance of place (adj/ changed considerably)
Striking change
Unchanged parts
Body paragraph 1
Changes 1
Body paragraph 2
Changes 2
Essay:
The two maps illustrate how a city hospital was accessed in the years 2007 and 2010.
Overall, the hospital became easily accessible with changes to the road design over the period shown. The main changes include a large new bus station and two separate car parks for public and staff use.
In 2007 the city hospital was surrounded by a ring road and the hospital was reached from hospital road joining ring road from the south. There were six separate bus stops alongside hospital road and these were completely destroyed. In the meantime a whole new bus station was constructed to the west of hospital road.
The main alteration to the design of the road was the construction of two new roundabouts at the northern and southern ends of Hospital road. Two new roundabouts meant that bus station was accessed from two separate entrances and hospital road was mainly used by small vehicles. Finally, the existing carpark in the south east of the hospital, was restricted to staff use only, whereas a new carpark for public access only was built in the east of hospital.
Do'stlaringiz bilan baham: |