“Er uchastkalarini tashkil etish, topografik-geodezik, kadastr s’yomkalari ishlarining qiymatlari to‘g‘risida”gi 2009 yildagi 12 iyundagi 62-1-sonli yo‘riqnoma.
7. E.Q.Qurbonov. “Er munosabatlarini tartibga solishga doir qonun va me’yoriy hujjatlar to‘plami” / Er resurslari Davlat qo‘mitasi. Toshkent, 2000. -55-60 b.
8. T.K.Qo‘ziboev. “Geodeziya”. /Toshkent: O‘qituvchi, 1975. -50...255 b.
9. K.N.Norxo‘jaev. “Injenerlik geodeziyasidan praktikum”. /Toshkent: O‘qituvchi, 1976. -43...185b.
10. A.R.Bobojonov, Q.R.Rahmonov, A.J.G‘ofirov. Er kadastri. /Toshkent: CHo‘lpon, 2002. -65-78 b.
11. E.Q.Qurbonov, A.R.Bobojonov, Q.R.Raxmonov. “Er kadastri asoslari” /Toshkent: TTESI,1999. -76-89 str.
12. N.Murodullaev, A.Raximov. “Er tuzish iqtisodi” fanidan o‘quv-uslubiy majmua /SamDAQI. Samarqand 2011. 66 b.
Cadastral filming the form of technical specifications.
plan:
1. Cadastral filming the form of technical specifications;
2. Requirements for the establishment of cadastral imaging techniques assignments.
Key words: Topographic surveying work of the technical commission, land address, technical tasks, zoom, horizontal cutting height, the underground elements koordinatalashtirish komunikatsiyalarini surveying, topographic surveying documents, gorizontallar cutting height, azimuth detection.
On the State Land Cadastre of the Republic of Article 21 of the Law [2] for the cadastral survey of land plots and borders as well as mapping and cadastral maps and plans in order to maintain and aerofotogeodezik and styles performed on the topographic surveying works determined in accordance with the technical requirements arising out of the land parcel size scale implementation process.
Primarily the preparation of cadastral imaging topographic surveying the material [21] is prepared:
1) topographic survey work shirt sheet of material (Figure 8).
The following symposiums:
- Topographic surveying works companies;
Address land surveying was performed in imaging;
- The company responsible for carrying persons Name and the signature;
- The head of the department of topography and geodesy Name and the signature;
- Cadastral shootings Name of the acting and signature.
2) a list of materials kept in the archives of the Organization folder (Figure 9).
Cadastral technical documentation and carry out filming completed cadastral imaging organization compiled a list of materials for the transfer of the archives, the archives and the number of pages numbers are displayed. List of materials stored in the archive is signed by the Executive topograf.
3) Topographic surveying work for technical tasks (10 photos)
Technical assignment of the following information will be included: the organization and the name of the Client:
- The name and address of the facility;
- Topographical surveying work, goals and objectives;
- Topographical surveying the volume and type of work;
- Scale, horizontal cutting height, koordinatalashtirish elements and others;
- Underground surveying komunikatsiyalarini or imaging extract;
- Topographical surveying the list of documents to be submitted;
- Work;
- Land border schemes.
Topographical surveying work on the technical task for the visitors and the executive by last name, first name, surname and office and signed the executive and approved by an official of the seal.
4) Topographic surveying work program (Figure 11).
The following information will be included in the program:
- The name of the object is performed;
- The types and volumes of work;
- Term;
- The complexity of the work;
- The accuracy of the topographic survey work, and according to the regulations;
- Planning and altitude coordinates detection systems;
- Cadastral works on imaging applied to the cost of the regulatory package;
- Funding.
Program, '' the seal of the organization and approved by an official.
5) topographical survey work study (Figure 12).
It is registered in the document are as follows:
- Cadastral imaging executed by planned and height surveying buildings;
Surveying the scale of imaging;
Gorizontallar cutting height;
- Selected for filming and surveying equipment;
- To complete the survey method;
- The number of copies made;
- Method of surveying underground komunikatsiyalarini;
6) Customer materials. (Figure 16).
Cadastral cadastral after performing the imaging of the following materials are included in the collection of documents, duly registered and submitted to the owner of the property:
- Copy of cadastral surveying;
- Specific table;
- Determine the azimuth table;
- Close the border and agreed to act;
Acting original field and off and land imaging company deposited in the archives.
7) The explanatory notes to complete the cadastral imaging (Figure 13).
I wrote the following comments:
- Land address;
- Collection of works topografik- conducting survey work;
- Artist F.I.Sh .;
- The description of the topographic survey work carried out;
- Topographic survey work on the final result.
8) Geodetic transfer of characters (Figure 14).
In the process of the topographic surveying, and land border points the owner of the property submitted by the act of filing -qabul. Two copies of an act, the acting head of the enterprises (chief engineer), signed, sealed and signed by the artist and the owner of the property.
9) Technical (15).
It is registered in the document are as follows:
- The name of the chief executive of the enterprise;
- Technical number (cipher) and date;
- Scale topographic surveys;
Gorizontallar cutting height;
- The name of the object;
- The beginning and the end.
8 Photos
Ministry of Land Resources, Geodesy, Cartography and State Cadastre
Samarkand region land management and real mulkkadastri state unitary enterprise.
__ _ 58 of Samarkand A.Jomiy Street area
cadastral documentation topographic survey work.
MATERIALS
Sam reg 'supporting'
a state unitary
Head of enterprise
Deputy _______ B.Yunusov ________________________
Topography department ___ _B.Normatov__ ___________
Leading geodezist _______ Sh.Fattoxov ____________________
9 photos
Materials stored in the folder
No. Name Search Archive Number Description
1 Terrain 1 to perform technical tasks
1, 2 TGI work program
3 TGI explanatory note 1
4 Calculation Table 1
5 calculate the azimuth table 1
6 The act closed the land border to the Customer 1
7 cadastral documents and topographical work to check and to act 1
Catalogue 8 Coordinates 1
Topographic plan 2 9
10 Geodetic mark the transfer act 1
Developer: ____________________ Sh.Fattoxov ________________
10 Photos
'Approved'
Sam reg 'supporting' the deputy head of the State Unitary Enterprise _____________
___ ___________ 2013
Topographic surveying works
technical commission
______________________ Samvilermulkkadastr »__________________
(Doer of work - the organization, the name of the department)
1.Buyurtmachi _________________ A.T. Djuraev ______________________
(Visitors - the organization, the name of the department)
The full name of the 2.Obe'ktning advisory diagnostic center ________
3.Obe'kt location: Samarkand A.Jomiy 58 __________
4.Loyihalash stage _____ Topo-geodesic works _______
5.Loyihalanayotgan construction, rehabilitation, rest the general description (enterprises, and SH.U.) The aim of the topographical surveying work and responsibility to carry out the work for the preparation of Cadastral xo'jatlarni topographic surveys
The volume and type of work to be 6.Bajarilishi topographic surveying: geodetic base stations for surveying sites and built topographic (koordinatlashtirish elements), some of the existing line route structures underground komunikatsiyalarinig plan or the plan to create together. Surveying area, scale, and in some areas gorizantallar cutting height, the length of the route. Last year, plans to make changes to the usual survey, inspection, etc. ______ Facilities, the building of the local connection points and turning points koordinatlashtrish objects 1: 500 scale topo plan ___________________________________________________
7.Har (transport and engineering-geological work planned tie-height, to determine the rate of flow of the water to measure the depth of the basin and others ____ surveying underground communications, and topo plant extract _________________________________
8.Ayrim specific type of work, and demand for its accuracy ________________________________________________________
9.Obe'ktda on the results of the work performed topographic surveying the list of documents to be submitted to the borders of the table to determine the area of _____ plant extract wards act ____________
10.Ishning respectively, and intermediate documents _______________________________ 15kun _____________________________
11.Grafik additional land border scheme or plan (card) excerpt ________________________________________
Mapping the task ________ ___________________________________
(Visitors-organization and representation of the position, Telex)
Assignment ____________________ __________________________
(A doer of the organization, the representation of the position, Telex)
Figure 11
'Approved'
Sam reg 'supporting' the deputy head of the State Unitary Enterprise
____________ B.Yunusov
___ ___________ 2013
D A S T O P
Object of topographic surveying work performed advisory diagnostic center _____________________________________________
GENERAL INFORMATION
_________ Samvilermulkkadastr »__________ following the instructions given by the technical performance of the volume and types of business shall include:
№ Project Unit of measurement of total volume of work Category
I II III
1 _______ bit trianglyatsiya
2 _______ bit poligonometriya
3 IV class nivilerlash
4 Technical nivilerlash
5 Taxeomitr imaging m b 1: 500 final height of 0.5 m 0.10
Built area of 6. Surveying the BBC 1: 500
7 m height of the squares built imaging-B 1: 500
cut _______
8 surveying changes in the common areas built (korektirovka) m-bi 1: ______
9 underground surveying facilities and nivilerlash
_ Samvilermulkkadastr DUK__tomonidan carried out in August 2013.
Work SamvilErmulkkadastr __ km away from the following description (complex) objects the relief of moderate complexity, trees, and buildings close __________________
The depth of the layer of frost _________________
The accuracy of the topographical surveying work and method in accordance with the regulatory requirements of the following: 1: 2000, 1: 1000, 1: 500 scale plan for topographic symbols SNIP 1.02.07-87y Rukovodsvo ______________________________________________________
Plant local coordinate system _________ ___________________
Heights, the local coordinate system ________ __________________
Cadastral surveying work to provisional estimates the price set in 2006. Evaluated.
Funding ______ A.T. Djuraev.
Figure 12
Topographic-geodetic study
The Plan is based on surveying the city of Samarkand enough ___ Poligonometrik points in the local coordinate sestemasida _________
Height geodetic basis ___________ ________________ of the Baltic Sea
Topographic surveys ______ 1: 500 scale topographic surveys of 1: 2000 scale and horizontal cutting height of 0.5 m ___________
Topographic surveys and special
______ Square meters area gorizontllar cut balandligi__0,5 m__ m scale __1: 500__ surveys have implied ________________
Plant height of the geometric method for promoting the key points of the survey will be determined by technical levels:
_12_ Points based on the survey of long-term storage can be hidden, including the center of the floor __ (_), the center of the wall __ (__).
Menzula the basis of the survey at any time or through zichlashtiriladi.
Horizontal squares built imaging _TS 307 LEIKA__markali performed using electronic total station.
Built arenas quarter interim and fulfillment of the survey of buildings and structures along the logging of the results obtained by measuring the contour of Abril.
Built in the fields of surveying the details and the relief of ___________________ Taxeometrik _________________________ ways.
Underground komunikatsiyalari surveying and ishootlarni done ______.
Underground facilities and komunikatsiyalari nivilerlash __chiqib performed well koordinatlashtirilashtirish ___.
Land use, engineering and surveying tormoklarining the boundaries of the main technical characteristics agreed _____________.
For more information _________________________________________
Topographical plans Lafzi shield will be formed and 197__y. Printed drawn on the basis of the conditional character, then ____ paper ___________ ________________________________ multiplied.
And work in the object controlled by the head of the technical department of the state security field. Compared with the investigation of the case, the plan is carried out, check the accuracy of distances measured and the height of the dots to be built. The results of the check to observe and act.
13 Photos
explanatory note
entry
According to technical __ Samarkand A.Jomiy 58 _ topographical geodesic works carried out on the territory of
Basis of topographic surveying of the following kinds of works have been completed.
1 1: _500 ___ scale topographic surveys
2 1: ________ scale karrektirovka
3 underground and surface facilities, as well as surveying komunikatsiyalarni
4 search results in off-site processing __________________________________________________________________________________________________________________________
Topographic surveys have been completed by Sh.Fattoxov ___ ___
Topographic survey work
The accuracy of field surveys have Sulukta 1: not less than 2000, shall be formed by way of closed circuit stations
Stations 2 and a half corners on the way Pryor _TS 307 LEIKA__ branded stations with measured distances ____ m with steel tape and measured in the opposite direction
The main point of the survey through technical nivelerlash.
A key point is the status of planned and height for surveying the state geodetic linking the base stations.
___ 12__ area covered with an act of the customer
The main building structures and key points of the survey stations koordinatlashtrish turning points of borders, then turned to logging results Abril 1: _500 ___ scale menzula survey to the horizontal cutting height of 0.5 m topographic plan. Background underground and surface communications and facilities.
SUMMARY
Topographic survey work 0.1 0.2 0,7-08 (SNIP) on the basis of the current state standard and Guide
Figure 14
'Approved'
Sam reg 'supporting' the deputy head of the State Unitary Enterprise
_____________ B. Yunusov
___ ___________ 2013
act
_____ Customer A.T.Djuraev delivery ____ surveying characters
We are duly Sam reg supporting a state unitary enterprise topography department spokesman __________________________
This act was signed, 'xakdakim__ Samarkand A.Jomiy 58-__________________________________________________________________
Topographic surveying the territory he gave his characters first and second.
Surveying the character and the pile of metal rectangular metal ______________. Strengthen the representative character buyurmachining above, and with this act. The act in two copies, and one of them was given to the bidder, the other in the special section.
Surveying handed characters ________ Sh. Fattakhov _________
Surveying the characters _____________________ A.T.Djuraev ___
15 Photos
Land resources of the Republic of Geodesy, Cartography and State Cadastre
SAMARKAND REGION land management and real MULKKADASTRI STATE ENTERPRISE.
Encryption _______________________
No. ______ ____ _ 2013__
TECHNICAL WORK
Topographic surveys m-bi 1: _500 ___ horizontal cutting height ___ 0.5__m
Object Hovli ______ _______________________________________
Samarkand A.Jomiy 58 _______________________________
Do not do business ____ Sam reg supporting a state unitary enterprise _______________________________________________
_____ Of the Deputy Chief of B.Yunusov _______________________________
The beginning of ________ 2013 .__________________________________
Dismiss ___________ 2013 ________________________________
Samarkand 2013
Figure 16
Customer MATERIALS
1.Topografik Planning copy, m-b 1: __500_ __1_____ copies.
2.Yuzani table ______1________ copies.
3. The azimuth table _______1_______ copies.
The act closed 4.Chegaralarni __1______ copies.
Field and off-site and registered in the material: _____ region supporting the archives of the state unitary enterprise storage and computer database collects _________________________.
Topographical plans for the archives of the Unitary _ Samvilermulkkadastr.
The number of additional pages
1. Technical Task 1 _______4_________________
2. Net estimated 1 ________________________
control
1. Texnik xususiyatlar va talablar bo'yicha topografik o'lchash ishlari?
2. Tashkilot arxivi, papkada saqlanadigan materiallar ro'yxati qanday?
3. Texnik vazifalarni ishlab chiqish bo'yicha topografik o'lchash ishlarini bajarish?
4. Topografik o'lchash ishlari, dastur nima?
5. topografik tadqiqot ishi tushunchasini o'rganib chiqdi.
6. Buyurtmachiga taqdim etilgan materiallar qanday?
7. Topografik o'lchash ish dasturi kim tomonidan imzolangan?
8. Kadastr tasvirlash tushuntirish yozuvi.
9. Topografik so'rov ish materiallari titul sahifasi va qanday ro'yxatdan o'tkaziladi?
ADABIYOTLAR
1. The Republic of Uzbekistan "Geodesy and Cartography" law. April 25, 1997.
2. "Land Code". The laws of the Republic of Uzbekistan. Volume 19 / T .: Justice, 1998. -120 p.
3. The Republic of Uzbekistan "On State Land Cadastre" law. The laws of the Republic of Uzbekistan. Volume 19 / T .: Justice, 1998. 25 p.
4. The Cabinet of Ministers of the Republic of Uzbekistan "On establishment of the unified system of state land and approval of the procedure for doing it", No. 255 of July 17, 1996 and No. 66 of February 16, 2005.
5. "O'zdavergeodezkadastr" developed by the State Committee for "the procedure for the preparation of documents to the Real Estate Cadastre" VNA 2009 - No. 18 Manual.
6. "O'zdavergeodezkadastr" developed by the State Committee of the "land of the topographical surveying, cadastral values shootings works" Instruction No. 62-1 of June 12, 2009.
7. E.Q.Qurbonov. "The law on the regulation of land relations and regulatory documentation package" / State Committee for Land Resources. Tashkent, 2000. -55-60 b.
8. T.K.Qo'ziboev. "Surveying". /: Teachers, 1975. -50 ... 255 b.
9. K.N.Norxo'jaev. "Practicum engineering geodesy". /: Teachers, 1976 -43 ... 185B.
10. A.R.Bobojonov Q.R.Rahmonov A.J.G'ofirov. Land. /: Colpa, 2002. -65-78 b.
11. E.Q.Qurbonov A.R.Bobojonov Q.R.Raxmonov. "Inventory", /: TITLI, 1999. -76-89 Str.
12. N.Murodullaev, A.Rahimov. "The economy is on place" for teaching complex / SamGASI. Samarkand, 2011. 66 p.
Do'stlaringiz bilan baham: |